    玻璃鋼防腐管道安裝要求
    時間:2022-07-05  瀏覽:3325次

      Requirements for installation of FRP pipes

      1、玻璃鋼防腐管道在安裝前應(yīng)對設(shè)備管口、預(yù)埋件、預(yù)留孔洞、鋼結(jié)構(gòu)等涉及管道安裝的內(nèi)容進(jìn)行復(fù)核。

      1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

      2、管道的坡度應(yīng)按圖紙的要求進(jìn)行調(diào)整,調(diào)整方法可以利用支座達(dá)到坡度要求,焊縫應(yīng)設(shè)置在便于檢修、觀察的地方。

      2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

      3、與傳動設(shè)備連接的管道,安裝前內(nèi)部要處理干凈,焊接固定管口一般應(yīng)遠(yuǎn)離設(shè)備,以避免焊接產(chǎn)生應(yīng)力對傳動設(shè)備安裝精度的影響。

      3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

      4、管道與機(jī)器連接前,應(yīng)防止強(qiáng)力相對,在自由狀態(tài)下檢查法蘭的平行度和同軸度。

      4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

      5、安全閥應(yīng)垂直安裝,在投入試運(yùn)行時,要及時調(diào)校安全閥。安全閥的調(diào)校在系統(tǒng)上進(jìn)行,開啟和回座壓力要符合設(shè)計(jì)文件的規(guī)定。

      5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

      6、閥門安裝前,按設(shè)計(jì)文件核對其型號,并按介質(zhì)流向確定其安裝方向。當(dāng)閥門與管道以法蘭或螺紋方式連接時,閥門應(yīng)在關(guān)閉狀態(tài)下安裝;如以焊接方式安裝時,閥門不得關(guān)閉。

      6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

      7、儀表元件的臨時替代:所有儀表元件安裝時,均采用臨時元件替代,等試壓、沖洗、吹掃工作結(jié)束后,投料前再正式安裝。

      7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


    手机在线国产福利av| 国产一级内射视频在线观看| 男女激情视频网站在线 | 免费观看成人稀缺视频在线播放| 日本人妻av在线观看| 亚洲综合一区二区三区蜜臀av| 黑丝国产精品一区二区| 成人综合激情自拍视频在线观看| 亚洲一区二区三区ay| 久久久噜噜噜久久熟女| 水蜜桃网站视频在线观看| 日本高级黄色一区二区三区| 狠狠爱婷婷网五月天久久| 久久精品国产亚洲av蜜点| 成人性生交大片免费入口| 亚洲欧洲免费无码| 加勒比hezyo黑人专区| 久9re热视频这里只有精品| 久久久久亚洲精品无码网址蜜桃| 亚洲人成电影在线播放| 五级黄高潮片90分钟视频| 无码人妻少妇色欲av一区二区| 亚洲精品国偷拍自产在线观看蜜臀| 亚洲av成人一区二区三区av| 日本一区二区久久精品亚洲中文无| 成人在线视频亚洲国产| 一区二区亚洲精品国产精| 久久一区二区国产精品| 91精品国产92久久久| 蜜臀av在线观看| 日本19禁啪啪吃奶大尺度| 亚洲avav天堂av在线网爱情| 国产97在线 | 免费| 久久99精品国产99久久| 加勒比东京热久久综合| 国产无套粉嫩白浆内精| 亚洲中文字幕一区精品| av在线免费高清观看| 国产精品高清网站| 亚洲成av人在线播放无码| 久久精品免费一区二区三区|